California Builder & Engineer

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

MemorialCare Saddleback Medical Center Celebrates the Topping Out of $80M Women's Health Pavilion

LAGUNA HILLS, CA — MemorialCare Saddleback Medical Center, a nonprofit medical center in Orange County, celebrated the topping out, the marking of the placement of the last beam, of its forthcoming Women’s Health Pavilion. The new, $80 million, three-story, 40,000-square-foot facility, which is scheduled to open in summer 2023 in Laguna Hills, will elevate the future of women's health care with a focus on their health care needs through all stages of their lives.

Saddleback Medical Center’s Women's Health Pavilion will provide patients with access to breast care and a range of women’s health services under one roof. The center will provide women with streamlined and elevated care, access to same-day appointments, short wait times, and expedited screening results.

The Women’s Health Pavilion plans to offer personalized care provided by world-renowned specialists in breast care, obstetrics and gynecology, oncology, sexual health, and mental health. It will also feature the only integrated breast cancer center in Orange County with a breast oncologist, breast surgeon, and breast reconstruction surgeon under one roof. As part of the holistic women’s services MemorialCare is planning to offer, the campus will feature a first-of-its-kind, freestanding pelvic floor rehab clinic with a dedicated pelvic floor physical therapist.

“Setting the final beam on the Women’s Health Pavilion is truly a monumental occasion,” said Marcia Manker, CEO, MemorialCare Saddleback Medical Center. “After seven years of planning and three short months, it is incredible to see how quickly the structure of our vision has been constructed. We look forward to opening our doors in 2023 and welcoming women across the county to experience a new, integrated, and holistic approach to women’s health.”

MemorialCare executives, donors, and staff gathered at the construction site today and celebrated the next phase in construction. As part of the topping out ceremony, attendees were invited to sign the final beam before it was placed on the building. Taylor and Sarah Nederlander of the Harry J. Nederlander Foundation were also on-site. The sisters donated $2.5 million to facilitate the new Sarah & Taylor Nederlander Breast Center, which will allow MemorialCare to offer access to screenings, diagnostics, and expedited screening results, and will nearly double the number of patients served each year.

SITECH
Your local Trimble Construction Division dealer
SITECH Southwest
SITECH West

MemorialCare partnered with c|a ARCHITECTS and general contractor Turner to turn their vision into a reality. Following the groundbreaking in September 2022, Turner erected the steel structure of the modern facility and incorporated sustainable materials. Turner was challenged with ensuring an existing building four feet from the new building remained in operation, and that visitors remained safe during construction. The building features nearly 200,000 pounds of rebar at the mat slab and one million pounds of steel. During construction, Turner had to navigate through 1.5 miles of underground utilities.

Gomaco
Your local Gomaco dealer
Terry Equipment
Gomaco
Your local Gomaco dealer
Terry Equipment
Gomaco
Your local Gomaco dealer
Terry Equipment