The highway and bridge projects included in this program are funded with approximately $4.5 billion of state and federal funding forecast to be available over the next five years. The commission prioritizes investments that improve the safety and condition of existing state highways and bridges, and this program includes over $3.9 billion of investments in that area.
This program invests in projects that add capacity where necessary, replace major river crossings, and modernize interchanges to improve safety and to handle future traffic demands, such as:
- I-80 Middle Road Interchange reconstruction in Bettendorf
- I-80 Mississippi River bridge replacement
- I-35/80/235 Southwest Mixmaster modernization in Polk County
- I-380 widening from 120th Street to U.S. 30 (including Wright Brothers interchange reconstruction) in Linn County
- I-380 widening from Swan Lake Road to 120th Street in Johnson and Linn counties
- I-35 bridge replacement and widening at the U.S. 30 interchange in Ames
- I-35 widening between Ankeny and Iowa 210
- I-29 interchange construction in Woodbury County
- Addition of over 50 truck parking spots
Projects in this program that address safety and operational needs include:
Your local Gehl Co dealer |
---|
Star Equipment LTD |
- Iowa 21 near Belle Plaine to improve access during times of flooding
- U.S. 75 north of Sioux Center to south junction with U.S. 18 to replace aging pavement
- Iowa 149 Des Moines River bridge to Woodland Avenue in Ottumwa to replace aging pavement
- Iowa 12 Gordon Drive bridge in Sioux City to replace an aging viaduct
- Iowa 58 Greenhill Road Interchange in Cedar Falls to replace an existing at-grade intersection
- U.S. 151 Interchange with County Road X-20 at Springville to replace an existing at-grade intersection
- U.S. 30 Interchange at 610th Avenue at Nevada to replace an existing at-grade intersection
- Super-2 improvements on U.S. 63 in Tama County and U.S. 18 in Kossuth County to provide more passing opportunities and improve safety